The short paragraph on the base of the cement stable macadam mixture full width double even shop in 2020 project topics for the company, subject to undertake units for equipment operation department, subject based on NingLiang bid highway paving construct ......
《The Technology of Self-moving Mold Frame for Rapid Construction of Pipe Gallery》is a project approved by the company in 2020, which is undertaken by North China Company and participated by engineering Research Institute. Relying on the RDSG-4 project in ......
Project summary:Jiqing expressway reconstruction and expansion project is the first four transformation and eight expressway construction project that does not interrupt traffic in Shandong province. It is also the first expressway reconstruction and expa ......
The Dongxihu sports center is for the 7th military sports meeting in 2019. As a new sports center uniformly deployed by the wuhan municipal government, it is a key project of the municipal party committee and the municipal government. It is required to pl ......
The continuous beam adopts 40m+64m+40m swivel to cross the existing railway and form an angle of 47 with the railway line. The continuous beam construction is divided into two parts. After the construction of the swivel part is completed, the swivel is tu ......
Prefabrication, transportation, hoisting and on-site assembly of components have high requirements. The prefabricated piers and cover beams shall be of accurate size and shall be delivered after being pre-assembled in the factory. During the construction ......
The main bridge adopts a pile foundation with a diameter of 2.0m (length 93m), 19.2144m low pile cap, 8.55m thin-walled rectangular hollow pier (high 18.5m), and the upper structure is 3(100+4140+ 100)m variable section continuous beam, a total of 18 susp ......
The project is located in Saraburi, Thailand. The completion of the project has greatly improved the transportation from Bangkok to Saraburi, bringing convenience to the local people and driving the rapid development of the local economy. The three-dimens ......
In the tunnel construction, for the large-scale cave group, the geological exploration + grouting + new steel-concrete structure is combined to cross the tunnel-rich water-rich karst section, and the plugging and discharging are successfully combined to f ......
The structure design of the project is diverse and novel, there are many types of construction methods and frequent process changes, the tunnel entrance adopts the three-layer 7-hole three-dimensional superimposed design of highway and rail transit tunnel ......