R&D Field

2020-10-15
Highway Field—The short paragraph on the base of the cement stable macadam mixture full width double even sho

The short paragraph on the base of the cement stable macadam mixture full width double even shop in 2020 project topics for the company, subject to undertake units for equipment operation department, subject based on NingLiang bid highway paving construct ......

More
2020-08-26
Pipe Gallery Project-The Technology of Self-moving Mold Frame for Rapid Construction of Pipe Gallery

《The Technology of Self-moving Mold Frame for Rapid Construction of Pipe Gallery》is a project approved by the company in 2020, which is undertaken by North China Company and participated by engineering Research Institute. Relying on the RDSG-4 project in ......

More
2020-07-24
Highway Field—Study on the application of green comprehensive regeneration technology for waste from highway

Project summary:Jiqing expressway reconstruction and expansion project is the first four transformation and eight expressway construction project that does not interrupt traffic in Shandong province. It is also the first expressway reconstruction and expa ......

More
2020-05-27
Municipal engineering field --- Dongxihu sports center construction project

The Dongxihu sports center is for the 7th military sports meeting in 2019. As a new sports center uniformly deployed by the wuhan municipal government, it is a key project of the municipal party committee and the municipal government. It is required to pl ......

More
2019-11-21
Bridge Field---Rotating continuous beam

The continuous beam adopts 40m+64m+40m swivel to cross the existing railway and form an angle of 47 with the railway line. The continuous beam construction is divided into two parts. After the construction of the swivel part is completed, the swivel is tu ......

More
2019-11-21
Bridge Field---Assembly bridge

Prefabrication, transportation, hoisting and on-site assembly of components have high requirements. The prefabricated piers and cover beams shall be of accurate size and shall be delivered after being pre-assembled in the factory. During the construction ......

More
2019-11-21
Bridge Field---Cross the Yellow River porous large-span highway bridge

The main bridge adopts a pile foundation with a diameter of 2.0m (length 93m), 19.2144m low pile cap, 8.55m thin-walled rectangular hollow pier (high 18.5m), and the upper structure is 3(100+4140+ 100)m variable section continuous beam, a total of 18 susp ......

More
2019-11-21
Bridge Field---Segmented box girder erected external prestressed bridge

The project is located in Saraburi, Thailand. The completion of the project has greatly improved the transportation from Bangkok to Saraburi, bringing convenience to the local people and driving the rapid development of the local economy. The three-dimens ......

More
2019-11-21
Tunnel Area---Long & large karst tunnel

In the tunnel construction, for the large-scale cave group, the geological exploration + grouting + new steel-concrete structure is combined to cross the tunnel-rich water-rich karst section, and the plugging and discharging are successfully combined to f ......

More
2019-11-21
Tunnel Area---Superimposed tunnel group with shallow buried, large span and super close-in multi-cavity

The structure design of the project is diverse and novel, there are many types of construction methods and frequent process changes, the tunnel entrance adopts the three-layer 7-hole three-dimensional superimposed design of highway and rail transit tunnel ......

More
  • Home
  • 1
  • 2
  • Next
  • End
  • Total 2 Page 14 Records

国际彩票九码,福彩3D注册,中福在线彩票官网,江苏移动体彩,财富彩票群,网上购彩网址,金叶彩票平台,金祥彩票登录,安徽福彩站,辉煌彩票团队,彩票快三平台,698彩票,河内5分开奖,乐透开奖号,鸿运28彩票,优信彩票,河北福彩快三,金融彩票,胆拖开奖查询,小乐彩彩票,彩票类乐彩网,彩票快三平台,彩票齐全网址,蓝彩和彩票,彩票256,彩798彩票,快三龙虎彩票,铭发彩票官网,猜龙虎彩票,海燕论坛,排三开奖比例,城市彩票,788彩票,易算彩票,751彩票,北京大乐透,乐彩开奖时间,乐其彩票网站,欢乐彩票计划,英国官方彩票,海南体育彩票,爱米彩票,篮彩分析app,巨乐彩彩票,大8彩票稳赚,好用彩票平台</html>